| | | | | | | | Council Communication
Department: Public Works Admin
Case/Project No.: PW22-06C
Submitted by: Matthew Cox, Public Works Director | Resolution 23-125
ITEM 8.F. | Council Action: 4/24/2023 |
|
| | | | | | | | Description
Resolution accepting the bid of Peterson Contractors, Inc. in the amount of $1,557,120.50 for the Levee Certification Project, Geotechnical MR_9. Project # PW22-06C |
|
| | | | | | | | Background/Discussion
On April 12, 2023, three bids were received through the City bidding software, Ion Wave, as follows:
|
|
Division I
General
|
Division II Paving
|
Total
|
|
Peterson Contractors, Inc., Reinbeck, IA
|
$1,534,808.00
|
$22,312.50
|
$1,557,120.50
|
|
Mount Farm Drainage, LLC, Riverton, IA
|
$1,643,147.00
|
$24,990.00
|
$1,668,137.00
|
|
Valley Corporation, Valley, NE
|
$2,134,687.34
|
$26,268.40
|
$2,160,955.74
|
|
|
|
|
|
|
Engineer’s Opinion (HDR)
|
$2,398,700.00
|
$21,300.00
|
$2,420,000.00
|
The City of Council Bluffs owns or sponsors multiple levee segments which encompass the City Federal Levee System, providing flood protection from the Missouri River, Mosquito Creek, and Indian Creek. These levee systems are currently shown on FEMA floodplain maps as being accredited and are identified as providing protection from the 100-year flood or 1% annual chance flood event.
In order to maintain the level of protection identified on the FEMA Flood Insurance Rate Map, it is necessary to provide documentation to FEMA that complies with the requirements of 44 CFR 65.10. If the levees are not certified, they will be de-accredited and FEMA will begin the process of updating maps. Areas previously protected by the levees will be identified as flood-prone.
In order to meet the criteria for levee certification, improvements to each of the levee systems will be necessary. The purpose of the Geotechnical MR_9 project is to resolve seepage deficiencies along the Missouri River. The project will construct large berms along the land side of the levee.
This project was included in the FY22 CIP. The project costs will be paid from levee improvement program funding including the Iowa Flood Mitigation Program and Local Option Sales Tax funds programmed for levee improvements.
Construction is scheduled to start in May 2023 and be complete by June 2024.
|
|
| | | | | | | | Recommendation
Approval of this resolution. This project will improve the levee system to meet the criteria for certification.
|
|
|