Background/Discussion
On December 13, 2022 bids were received through the City bidding software Ion Wave as follows:
|
Division I General
|
Division IV San. Sewer
|
Total
|
|
| |
|
|
|
|
Judds Bros. Construction Co.
|
$125,000.00
|
$265,210.00
|
$390,210.00
|
|
Lincoln, NE
|
|
|
|
| |
|
|
|
|
Engineer's Opinion (JEO)
|
$297,450.00
|
$398,965.00
|
$696,415.00
|
The Avenue F sanitary sewer between N. 10th Street and N. 12th Street crosses under four Union Pacific Railroad Tracks. The existing sewer under the tracks has failed and is currently allowing little to no flow through the sewer. The failed sewer is also allowing railroad ballast to get into the pipe.
JEO Consulting Group reviewed the damage and submitted a certificate for emergency repair on June 30, 2022.
The project requires boring a new pipe under the UPRR tracks and connecting the sewer on each sides of the tracks with new manholes.
This cost for the emergency repair will be paid with Sales Tax Funds.
| The project schedule is as follows: |
Award |
January 9, 2023 |
|
Construction Start |
February 2023 |
|
|
|