| | | | | | | | Council Communication
Department: Public Works Admin
Case/Project No.: PW22-09
Submitted by: Matthew Cox, Public Works Director | Resolution 21-184
ITEM 7.C. | Council Action: 6/14/2021 |
|
| | | | | | | | Description
Resolution accepting the bid of Compass Utility, LLC for the East Manawa Sewer Rehab, Phase X. Project # PW22-09 |
|
| | | | | | | | Background/Discussion
On June 3, 2021 bids were received through the City bidding software Ion Wave as follows:
|
Division I General
|
Division II Pavement
|
Division III Storm Sewer
|
Division IV San. Sewer
|
Division V Water Main
|
Total
|
|
|
Compass Utility, LLC
|
$266,143.23
|
$482,579.80
|
$94,992.59
|
$343,149.41
|
$130,307.75
|
$1,317,172.78
|
|
Council Bluffs, IA
|
|
|
|
|
|
|
|
Engineer's Opinion
|
$288,964.75
|
$429,779.00
|
$103,355.00
|
$324,494.00
|
$157,175.00
|
$1,303,767.75
|
The area of East Manawa is very flat with open ditches. There are no storm sewers in this area and the streets are thin asphalt or seal-coated rock roads. During rainfall events, considerable surface ponding occurs due to the poor drainage.
Due to the narrow right-of-way (30 ft.) and the high water table in the area, conventional storm sewer construction is not practical. The use of porous pavement in conjunction with a drainable granular base and shallow subdrain/conveyance system was determined to be the most cost effective means available to improve the area drainage. The rehab program also includes installation of new sanitary sewers utilizing a vacuum system.
Phase I and II of the program included Huron Circle from Navajo to north of Osage Street. Phase III of the program was construction of the sanitary sewer vacuum pump station. Phase IV was the first phase of vacuum sewer installation with the porous pavement and subdrain system on Huron Circle from Navajo to just west of Blackhawk Street. Phases V through IX continued the rehab and completed Huron Circle, Blackhawk Street, Osage Street, Victor Street, Aztec Street, East Navajo Street and extended the vacuum sewer along Navajo Street.
Phase X includes Pickard Lane from Hall Walk (Alley) south to Navajo Street.
This project is included in the FY22 CIP and has a revised budget of $1,425,000 in Sales Tax Funds.
| The project schedule is as follows: |
Award |
June 14, 2021 |
|
Construction Start |
July 2021 |
|
|
| | | | | | | | Recommendation
Approval of this resolution. This project continues the infrastructure improvements for the neighborhood.
|
|
|