Background/Discussion
On March 16, 2021, bids were received by the DOT as follows:
|
Dixon Construction Co., Correctionville, IA |
$2,850,182.50 |
|
Engineer’s Estimate (HGM) |
$1,783,000.00
|
The Competitive Highway Bridge Program (CHBP) funding was made available by Division L of the Consolidated Appropriations Act of 2018 by the federal government. The North Broadway Bridge over Indian Creek was selected to receive the CHBP funds.
The North Broadway Bridge over Indian Creek (FHWA Structure 043960) ranked high enough among other bridges in the state to qualify for participation in the program.
The CHBP funds allow for funding of 55% of the construction cost of the bridge up to a maximum of $1,256,260. The remaining construction costs will be paid using Federal-Aid SWAP funds per agreement No. 4-19-HBP-SWAP-10. The engineering costs associated with the project will be paid by the City.
The existing bridge will be replaced with a box culvert section along Indian Creek. A new three-lane roadway with a trail on the east side and sidewalk on the west side will be constructed over the box culvert. Use of the CHBP funds requires the project to be bundled with two Montgomery County bridges and let as one project through the Iowa DOT.
The project was included in the FY21 CIP with a budget of $2,300,000 in Federal and State funding with a local contribution of $437,000 in Road Use funds.
| The project schedule is as follows: |
Construction Start |
Fall/Winter 2021 |
|
|
Construction End |
Late Spring/Early Summer 2022 |
|
|
|
|