Background/Discussion
Drainage District #22 for Mosquito Creek is operated by the City of Council Bluffs.
An easement is required for construction and operation of a new petroleum pipeline. Due to the condition of the existing pipe that crosses Mosquito Creek, a replacement pipe must be installed on a new alignment located outside the existing easement. The old easement will be released when the new one is granted.
The benefits to the Drainage District as a result of the project include:
-
The existing 300’ wide easement will be released and replaced by a 50’wide easement.
-
The existing 1930’s pipeline that is currently exposed within the creek bank will be removed, eliminating the risk of a leak.
-
The new pipe will be horizontally directionally drilled underneath Mosquito Creek.
The new permanent easement and right-of-way is 50 feet in width, centered on the pipeline. It is located in the Northeast Quarter of Section 18, Township 74 North, Range 43 West of the 5th P.M., Pottawattamie County, Iowa. The easement encompasses 18,748 square feet.
The permanent easement allows for the construction, installation, operation, maintenance, reconstruction, replacement, and abandonment of a pipeline or pipelines and all appurtenances thereto, including markers, valves, and cathodic protection equipment, over, under, upon, through, and across the right-of-way for the transportation of gases, liquids, solids, or any combination thereof, together with the right to enter upon said right-of-way to maintain the pipeline(s).