Department: Public Works Admin
Case/Project No.: PW24-11
Submitted by: Matthew Cox, Public Works Director 
Resolution 23-246
ITEM 4.G.
Council Action: 9/11/2023
Description

Resolution approving right-of-way acquisition in connection with the N. 28th Street Storm Sewer Rehab, Phase IV. Project #PW24-11

Background/Discussion

The N. 28th Street drainage basin limits are approximately I-29 to Avenue F and N. 10th Street to N. 33rd Street.  This area is roughly 580 acres.  The existing storm sewer network in this area was constructed in the 1950’s and is undersized causing frequent street flooding. The existing storm sewer interceptors are located along Avenue L, North 24th Street, and Avenue K.  In the past, high ground water conditions have caused several of the storm interceptors to fail, resulting in costly emergency repairs.

Phase I is complete and consisted of construction of a new 84” storm sewer pipe under I-29. The Phase II project is complete and included the study of the drainage basin to identify and prioritize future projects and connected the 84” storm sewer to the N. 28th Street storm sewer pump station. Phase III is nearly complete and included the extension of the 84” storm sewer from south of the interstate to N. 28th Street.  

Phase IV will include the replacement of the storm sewer interceptor in Avenue L from 27th to 28th Street. The project will require the reconstruction of the roadways and sanitary sewer.  The phased approach of this rehabilitation project is based on prioritizing the roadways with existing storm sewer interceptors, frequent flooding areas, and infrastructure that is in poor condition needing immediate replacement.  

Due to the narrow right-of-way width of 40 feet, additional right-of-way is required at the northeast and southeast corners of the intersection of 28th Street and Avenue L for construction of the roadway radius and sidewalks.  The area to be acquired is less than 100 square feet at each corner.

The project was included in the FY24 CIP with funding from Local Option Sales Tax and Sewer Funds.  The preliminary project budget is $4,000,000.


Recommendation

Approval of this resolution to allow City staff to work with the adjacent property owners to acquire right-of-way.

ATTACHMENTS:
DescriptionTypeUpload Date
MapMap8/30/2023
Resolution 23-246Resolution9/6/2023